Connecting People to Reliable Power
The Desoto Group is a 100% safety-focused, full-service EPC firm in the T&D, gas construction, engineering, and power markets since 2008.
Desoto Group is a woman-owned, minority- owned, and veteran- owned EPC firm offering quality solutions to U.S. Utilities.
WHO WE ARE
The trusted leader in energy project delivery since 2008
Desoto is a full-service EPC firm serving U.S. utilities and customers for over 14 years. We are highly specialized in electrical and gas construction and engineering. Over the years, we’ve tackled some of the most challenging projects throughout the United States to build the infrastructure that powers our nation.
No matter the scale or complexity, we set the bar high for every project we undertake to ensure a safe project with on-time, on-budget, and on-scope (OTOBOS) successful delivery for our clients.
Desoto by the numbers
Years of outstanding service
0
+
Project value
$
0
M+
Loss time incidents
0
Commitment to quality and safety
100
%
OUR CLIENTS
Our clients include some of the most reputable public and privately–owned Utilities
WHAT WE DO
We design and build turnkey solutions for infrastructure contruction
OUR COMMITMENT
Putting people and safety first
The safety of our people and community isn’t just a number to us — it’s woven into the very fabric of our culture. We’re continually improving our safety training programs, practices, and tools to achieve our vision of zero injuries.
FEATURED PROJECTS
Outstanding outcomes, delivered as promised
Georgia Power
Pole replacements, new installations, removal/wreck out, maintenance projects, overhead reconduct, and other miscellaneous electrical distribution projects.
2022
Georgia Power
Install new B phase pole and transfer utilities from old pole to new pole.
2022
Georgia Power
Various storm repair projects throughout Georgia.
2022
Florida Power & Light
Removal of remaining poles post construction and joint-use facility transfers.
2022
NiSource/Columbia Gas
Bare main replacements, service replacements, meter and regulator replacements, regulator station repair, valve inspections and other miscellaneous natural gas distribution projects.
2022
Entergy (via Lintec Services)
Rebuild of a 15.1-mile 161kV transmission line.
2022
Entergy
Construction of new 12.6-mile double circuit 230kV transmission lines, built as double circuit in existing and new ROW.
2022
AEP (via NorthStar|Quanta)
Site access services to new ROW including approximately 14,000 mats. Desoto provided all mats, as well as installation and removal crews and the associated equipment.
2022
Entergy
Site access services and matting for the first phase of a 70 mile new transmission line. Provided all matting, installation, and removal services, including multiple intermediate moves.
2020
CAREERS
Join our team
Desoto is poised for fast, steady growth and we’re looking for talented professionals to take our firm to new heights.
CONTACT US
Let’s work together
We have the expertise to fill all or part of your project’s scope. Contact us today and see how we can help you realize your vision.